Client: The Mustique Company
The client was concerned with the anthropogenic impact upon the marine environment caused by emissions of wastewater. Finebridge Consulting was commissioned to investigate a whole island wastewater solution.
This report consisted of a high level feasibility study for twenty-four private villas and two villages. Outline designs were produced with detailed cost analysis for the installations.
Several of the solutions offered were adopted for further detailed design and installation.